The Role of MEP in Building Construction

When a building is getting constructed, there are three primary components: the building itself, electricity, and water. These three aspects comprehensively make a proper place to live in a building under MEP contracting company Abu Dhabi. Thus, to come true, one must understand the importance of mechanical, electrical, and plumbing engineering.

When all three departments come together, they work to make the place fire protected. Moreover, there is extra attention to energy consulting and automation and a proper design for the building. It also includes adding air conditioners in the buildings and lighting and cameras for surveillance.

Mechanical Engineering

In this aspect, companies in Abu Dhabi look into the exterior parts of the building, among other elements. That could include the structure of the building along with other design work. But apart from the architecture, some more factors which mechanical engineers look into are as follows:

  • Central heating or conditioning
  • Ventilation
  • Lifts

Electrical Engineering

No building would properly function without electricity. Regardless of the purpose of the space, electricity is an essential factor that needs to be in the project. Thus, electrical engineers are in charge of the wiring of the entire building and the lights and lamps. The MEP system’s responsibility is the smallest of things, like even the color of the light.

Plumbing Engineering

Finally, water is the essential component in a building. Thus plumbing water pipes for water availability is necessary. They also take care of drainage and other water connections around the building. Even the taps are under the responsibility of the plumbing department, along with geysers and hot water arrangements.

Role of MEP in Building Construction

  • The mechanical, electrical, and plumbing departments work together and know MEP engineering. They are in charge of a complete functioning building from scratch. A good company would conduct research and make plans to notice the structure’s architecture and framework.
  • Next, they will map out the wirings of the building along with the light settings of the house. Depending on the building (residential or industrial), the number of lamps and lights will be decided.
  • Finally, when the electric system and the plumbing are figured out, the next step is to make a 3D plan. It would reflect how the whole building would look at the end of the project. Hence, the team would proceed with the project depending on the idea.

Conclusion

Therefore, in conclusion, people have seen a lot of work behind constructing a building. With the laborers working tirelessly, you see the structure come into shape. But not many people would know how much work goes behind the planning in collaboration with MEP departments. In addition, if you want fit out companies Abu Dhabi to help, visit us.